  • When the project is completed, the applicant must call for final building, electrical, plumbing, and fire inspections.
  • If the work continues without resolving the problem, the applicant will be fined and the job stopped

    edison township office

    Any work which does not conform to the approved plans will require reinspection, and in some cases amended drawings & permits.Applicants are required to post the permit prominently on the site and to keep a copy of the approved plans at the site.Inspectors must have 24 hours advance notice and must be able to see the part of construction required to be inspected.Insulation prior to installing sheet rock.Rough framing prior to installing insulation with completed Framing Checklist.Rough plumbing, electrical & fire prior to installing insulation.Foundation wall prior to backfilling with Engineered location survey.

    edison township office

    Footing excavation prior to pouring concrete.New construction usually requires the following inspections:










    Edison township office